After putting a new Andover o/haul kit through my Commando gearbox two things ive noticed that concern me..
I understand the layshaft end play need to be .005 and shimming is required to acheive this... The end play that i have measured (push pull kickstart ) is .040+ with dry gasket fitted and 4 nuts pinched up.... Seems a lot to need shimming, So is this a normal amount (.040) that needs to be shimmed.. Is this OK to shim down to .005...?????
Secondly, having fitted new main shaft and new bushes, i have found that rotating main shaft and drive sprocket by two oily hand (externally on the sprocket side) very firm. I can do it, just, by holding sprocket by hand and with a rag over mainshaft turn M/Shaft. So it seem to have mosr resistance than i would have expected.. I think when fitting bronze bushes one or both may have "distorted" when fitting................. If so will this "settle in" once the box is in service ?????
Thanks

I understand the layshaft end play need to be .005 and shimming is required to acheive this... The end play that i have measured (push pull kickstart ) is .040+ with dry gasket fitted and 4 nuts pinched up.... Seems a lot to need shimming, So is this a normal amount (.040) that needs to be shimmed.. Is this OK to shim down to .005...?????
Secondly, having fitted new main shaft and new bushes, i have found that rotating main shaft and drive sprocket by two oily hand (externally on the sprocket side) very firm. I can do it, just, by holding sprocket by hand and with a rag over mainshaft turn M/Shaft. So it seem to have mosr resistance than i would have expected.. I think when fitting bronze bushes one or both may have "distorted" when fitting................. If so will this "settle in" once the box is in service ?????
Thanks