Using a basic form of measurement with a feeler gauge While checking for run out on the advance retard unit I am getting 0.014” run out and would like to know if that is typical/acceptable given the the points gap should be in the region of 0.015”. Perhaps a stupid question as it’s probably an obvious answer to junk it or try truing?
Using a basic form of measurement with a feeler gauge While checking for run out on the advance retard unit I am getting 0.014” run out and would like to know if that is typical/acceptable given the the points gap should be in the region of 0.015”. Perhaps a stupid question as it’s probably an obvious answer to junk it or try truing?