Brooking 850
VIP MEMBER
- Joined
- Oct 3, 2011
- Messages
- 1,618
New member bike down in the Bay of Plenty New Zealand.
This bike came via the States, was sent from the factory, with only 6000m on it in 1998 and now has 17,500m on it, 1000m of which I have done since Sept.
Changes I have made include.
1 Thoroughly been through the frame, electrics , , brakes,wheel bearings, outer gearbox and primary chain case to change fluids and oils and check everything possible.
2 Install Pazon Sure fire ignition, including new 6 V coils , HT leads and caps.
3 Service front forks
3 install JS Flatslide carbs.
4 Fit new 100/90-19 Avon Venom to front and move good K81 Dunlop TT100 from front to rear wheel (New Avon to go on when this is used up)
5 Fit new indicators and flasher unit.
6 Fit new warning ligt assimilator
7 Remove , clean and repair oil tank
6 Repair seat base and reupholster using old rubber but cut and infilled with new foam. Silver logo on new cover
7 Remove choke cabling
8 Straighten footrest mounts
9 Have new header pipes fabricated
10 Touch up paint as and where required
11 And who knows what I missed on the list!!!
To do list,
1 Ride it often !!!
2 Fit belt primary drive
3 Ride it often
4 Attend NOC rally end of Jan 2012
5 Modify original air filter set up and fit to JS Keihin carbs
6 And heaps more as the need arises!!!!
As advertised
16000 miles
Getting it home
After a good clean, service and a few extras added at Lake Rotorua
This bike came via the States, was sent from the factory, with only 6000m on it in 1998 and now has 17,500m on it, 1000m of which I have done since Sept.
Changes I have made include.
1 Thoroughly been through the frame, electrics , , brakes,wheel bearings, outer gearbox and primary chain case to change fluids and oils and check everything possible.
2 Install Pazon Sure fire ignition, including new 6 V coils , HT leads and caps.
3 Service front forks
3 install JS Flatslide carbs.
4 Fit new 100/90-19 Avon Venom to front and move good K81 Dunlop TT100 from front to rear wheel (New Avon to go on when this is used up)
5 Fit new indicators and flasher unit.
6 Fit new warning ligt assimilator
7 Remove , clean and repair oil tank
6 Repair seat base and reupholster using old rubber but cut and infilled with new foam. Silver logo on new cover
7 Remove choke cabling
8 Straighten footrest mounts
9 Have new header pipes fabricated
10 Touch up paint as and where required
11 And who knows what I missed on the list!!!
To do list,
1 Ride it often !!!
2 Fit belt primary drive
3 Ride it often
4 Attend NOC rally end of Jan 2012
5 Modify original air filter set up and fit to JS Keihin carbs
6 And heaps more as the need arises!!!!
As advertised
16000 miles
Getting it home
After a good clean, service and a few extras added at Lake Rotorua