Still making progress, I was worried you’d ground to a halt.
Are you kidding?
Punchlist still looks something like this-
-power, lighting, A/C, insulation, walls & window in upstairs rooms
-upstairs bathroom (framing, piping, sheathing, walls, power, light, plumbing fixtures) $$$
-pony wall sheathing upstairs
-all upstairs paint work $$$
-Compile and haul off all trash, burn all combustible materials
-Clear all fields of rocks, bush stumps, and ALL cactus (rooted out)
-Rent excavator & complete pond construction $$$
-Rent bobcat and seal entire pond / creek bed with Sodium Bentonite granules $$$
-Mow 4 - 5 acres of tall grass
-Dirt work and final runway grading
-Construct secondary shed roof for tractor & implements $
-Construct septic drainage field & install septic tank (contractor) $$$
-Construct water well & pump house (contractor for well, I will build pump house) $$$
-Erect fence around 1 acre area including building (to cooperate with neighbors and obtain property tax agricultural discount) $$$
-extract all required materials from container in order to remove ultralight
-replace all of the above
-assemble and detail ultralight, prepare for flight $
-"Un Store" (7) motorcycles - oil change, battery, thorough cleaning, de-rust, etc. $$$
-All repairs to boat (electrical, oil change, battery, etc) $$$
Probably an equal amount of stuff I've forgotten to write down...