by pvisseriii » Tue Feb 14, 2012 2:17 pm
This is sort of the answer to why so many grounding points.
Your answer is that one wire from the signal switch, the other to the frame and/or bracket.
I am not saying that you cannot have too many grounding point, it's just that the 3 or 4 that you should have must be verified so that things like signal lights, horn and what not have a positive (configuratively, and in the case actually speaking) connection to earth.
Nortons, when they're right, they're righteous!
72 Commando Combat Roadster
Frame 149xxx,
Crankcase 210XXX
Gearbox 235xxx
and they all "match" up perfectly.